Preparation work for hot-dip galvanized square tube construction in building electrical engineering

Building electrical hot-dip galvanized square tube

Concealed pipe laying: Mark the horizontal lines and wall thickness lines of each layer, and cooperate with civil engineering construction; Install piping on precast concrete slabs and mark a horizontal line before placing it on the ground; After the bottom reinforcement is tied and the upper reinforcement is not tied, the piping inside the cast-in-place concrete slab shall cooperate with the civil construction according to the standard orientation of the construction drawing

Galvanized Square Tube

The prefabricated building panels are in place, and timely cooperation with the civil engineering team is required to complete the bending and connecting parts of the pipeline according to the requirements when picking up the anchoring bars (Hu Zi bars) in the panel joints; Prefabricated hollow slabs, collaborate with civil engineering to install pipes together; Collaborative construction of vertical pipes with walls (masonry); Pipe the cast-in-place concrete wall with the large formwork, tie the civil steel mesh, and pipe according to the wall line; Exposed pipe laying.

The required tools include a pipe burner. Hydraulic pipe bender. Hydraulic hole opener. Pressure case. Thread plate. Casing machine; Hand hammer. chisel. Steel saw. Flat file. Half round file. round file. Active wrench. Fish tail pliers; Pencil. Tape. Level ruler. A plumb bob and a shovel. Grey bucket. Water kettle. Oil drum. Oil brush. Pink thread bags, etc; Electric hand drill. Platform drill. bit. Shooting nail gun. Rivet gun. Insulated gloves. Something bag. Item box. High stool, etc.

Collaborate on pre embedded components for civil engineering structural equipment; Collaborate with civil engineering for interior decoration, paint and paste work, and then proceed with exposed piping; When selecting expansion tube equipment, it must be done after the civil engineering plastering is completed; During structural construction in suspended ceilings or wall panels, cooperate with civil engineering equipment to prepare pre embedded parts; {2} During internal decoration construction, collaborate with civil engineering to create a detailed layout of the ceiling light positions and electrical appliance orientations, and display the actual orientations on the pre board or ground.